Our current and recent projects include:
- HS2 (Northern and Southern Sections)
- Hail and Ghasha Offshore and Onshore EPC (Abu Dhabi)
- IPPS Coverage Study at Harmaliyah, Saudi Arabia
- GASCO LRF PAGA Coverage Study
- Surrey Quays Station Redevelopment
- NEOM Noise Impact Assessments (Saudi Arabia)
- Dalma Gas Development EPC (Abu Dhabi)
- Dubai Islands Aircraft Noise Study (Dubai)
- Lower Thames Crossing
- Colindale Station Redevelopment
- M25 Junction 10 Upgrade
- PAGA Coverage Studym Qatar Petroleum (Qatar)
- Brick-by-Brick (Croydon)
- DUQM Integrated Power and Water Plant (Oman)
- Molson Coors Brewery
- Survey and Mapping of H2S, Noise, Benzene, NORM – Block 3/05 (Angola)
- Oaklands Development
- Ivar Aasen Platform – Case study here
- Crossrail Contract C512 – Whitechapel Station – Case study here
- Crossrail Contract C530 – Woolwich Box
- Maindbower Shopping Village
- Johan Sverdrup Development
- Bart’s Square, London
- Noise control design of numerous LNG liquefaction terminals at FEED and EPC
- Thameslink – Blackfriars Station and Bridge Refurbishment
- Energy Institute – Good Practice Guide for Offshore Noise
- Channel Tunnel Rail Link Contract 570 (Rail and OLE installation)
- Kings Waterfront EIA, Liverpool
- Docklands Light Railway, City Airport Extension and New Woolwich Thames Crossing – Case study here
- West Coast Main Line track renewals
- Nigeria Expansion, Plus and Six Projects, Pre- and Post-startup noise surveys = Case study here
- Network Rail Southern Power Upgrade
- Pitwines Gasworks, Poole
- Holmethorpe Relief Road Underbridge
- Port Louis Power Station, Mauritius
- Dubai Environmental Noise Survey – Case study here
- Egypt LNG Noise Surveys
- Phoenix Quarter, Lewis
- Aweer Power Station, Dubai
- Noise survey of Sulphur Recovery Unit, Ruwais, Abu Dhabi
- Inter-Refineries Pipeline Project, Abu Dhabi
- Ras Laffan Common Cooling Water Project, Qatar
- Guidelines on Noise Impact Assessment (Defra)
- Olympics Media Centre, London
- Jumeirah Garden City, Dubai
- East London Line Project – Case study here
- Gas Processing Facilities (GPF) Project, Abu Dhabi
- Kings Cross Redevelopment, London
- ADGAS Offshore Associated Gases, Abu Dhabi
- Huntstown Phase II CCGT, Dublin
- Beynouna Drilling Rig, Abu Dhabi
- Bonny Island Noise Monitoring, Nigeria
- Various petrol filling stations
- Sound Insulation Tests to Approved Document E of UK Building Regulations
- Noise at Work Assessments
- Various noise and vibration assessments for local projects including new residential development and the installation for roof-mounted plant.